In
spring 2006 we started on the ground works for a new processing
building.
This was quite a project and took longer than anticipated as, when
surveyed, the fall over the site
was found to be nearly one metre.
The
poor Hymac 360
that was in semi retirement was given a new engine and told to get on with
it!! Several hundred tonnes of soil later and we had a flat pad ready to
start pouring concrete, seventy metres of this was poured and we had our
base. After leaving to harden for a few weeks we called
in the builders to
erect the building. |
 |